View Categories

How to Arrange Temperature Screening Device

1 min read

1. Unbox the temperature screening device package. #

There will be three parts: foot (base part), lower part, and upper part (thermal device) #

2. Connect the foot (base) and the lower part with screws on the 8 holes base. #

3. Open the lower part cap by releasing the screws on each side.  #

There will be 4 black cables inside when the black cap is removed. #

4. Put in the 4 white cables which connected to the device through the black cap. #

5. Connect the same white cables from the upper part to the black cables on the lower part side. #

There are several types of cables in one bundle (Wigan Output/Input, Ethernet, DC 12V, Relay, USB Host, USB OTG, and UBOOT) as shown below. All you need to do is connecting all white cables and black cables except for Wigan Output/Input and Relay cables.  #

6. Place the cable joint inside the lower part tube. #

7. Join the upper part and lower part. #

By placing the black cap on the lower part using screws, join the upper part (device) and the lower part. #

#

8. Adjust the height and you are ready to power up the device. #

After the device is powered up, make sure you follow this user guide on how to set up the device and sync it with the Temperature Screening system.  #